11/03/2009
THU,Happy 54th Anniversary,Happy Birthday!
SFL,leee.mobi
ieee.mobi,PPC,P.E.
NewYorkTaiwan.com
----------------------------------------------------------------------------------------------------------------
Date: 11/03/2009
IEEE.MOBI, PPC, P.E.
PowerGridAsia.com
PowerEssential.com
Professional Consultant
1979 To Date- PCA, Power
MISSION CRITICAL, BROAD, Worldwide
Music Essential & Critical,WWW
Dot, Critical & Essential,Websites Associated
---------------------------------------------------------------------------------
Experiences with( many years before today):
*建築師事務所(台灣台北市)
*技術服務社,顧問工程股份有限公司
*Syska & Hennessy,Consulting Engineers.,
希斯卡與瀚尼斯,顧問工程股份有限公司
l Jaros, Baum &Bolles, Consulting Engineers.
嘉洛士, 包畝 與 播魯士,顧問工程股份有限公司
l Caretsky & Associates, Consulting Engineers.
卡雷司基,顧問工程股份有限公司
1972-1975yr.-Chung Hsin Electric & Machinery Co.Ltd.:
1. ADSC,Area Development Service Consultant
2. Building Complex Development,
Large Area development project
3. Plaza: Partial Project Coordination.
4. Cogeneration power plants Promotion Task Force:
5. Large High-Tech Building complex and laboratory,
Central utility power plant and associated distribution.
6. Electrical system and super-computer data center
7. Building complex/Office + Show Room+Computer data Center
+Class Rooms+Studios+Hotel
9,000KVA Electrical System /Three Unit Sub-Stations
8. 60 Floors intelligent office building for banking and trading.
9. Cogeneration power plant parallel with Electrical
Power Company.
10. Power Station: 27KV/4160V newly built utility power substation
11. 47+ Floors Building,Mech. and Electrical load analysis
for Renovation
12. Super computer data center: 7th. & 8th. Floos computer data center with 1,450KW UPS System and associated mechanical system.
13. Super Computer Data Center:
4,000KW UPS and Mech.System.
14. 37th.floors building with trading floors
15. Satellite Operation Station: Mech. & Elec. System for Station Operation.
17. Dedicated computer data center for banking and trading.
18. Large Computer Data Center,NYC,USA: UPS System Function Analysis
19. 3,000KW UPS System Function Analysis (Wo.R.)
20. 87 floos building: Electrical Distribution system: 11KV-Primary/346/200V.
2,000KVA, 1,500KVA, 1,000KVA, and 750KVA Unit
Substations located on certain mechanical floors
21. The 72 Floors high rise building/each floor provided with Own
Metering devices.
22. Large Computer Dater Center with 3,000KW UPS
Electrical Distribution-5KV Primary/480/277V Secondary.
High-Tech. Intelligent Building
23. Heavy Lighting System with dedicated control system.
24. High-Tech Building Complex,Atlanta,USA
Large area building complex with office building and high-tech. Lab.
Power Co. Sub-station-50 MVA/110KV/13.8KV.
Unit Sub-stations-2,500 KVA/each.
Emergency Power system-25MW
25. Building designed, Electrical Load-4,000KW
27. 36 floors building, Electrical Load-5,000 KW.
28. Public Services Building
29. Technical Facility, Headquarter Complex
Electrical Load-9,000 KW
30. D- Company, Electrical Load-8,000KW
31. Tennant Floor Renovation for offices in downtown area.
32. 36th.Floor, Chicago, USA:
Mech. & Elec. System Renovation
33. Hospital, (Generator Plant Modification)
34. Hospital, (Partial Mechanical Room Renovation)
35.重要軍用民用建築物與設施
36. Additional name list will be offered if required(其他).
File#1,11032009
Ieee.mobi, PPC, P.E.
服務內容):
1電氣(ELECTRICAL SYSTEM)
*變電站 * 電話 *動力 * 廣播 *照明 * 公共電視天線 *緊急發電機 *不斷電系統
*監視控制系統 *火警警報 *電氣
2.配管設備 (PIPING)
*給水 *空壓機站及空氣配管 *飲用水 *鍋爐及蒸氣配管 *排水 *各種氣體配管
*衛生
3.消防設備 (FIRE PROTECTION)
* 消防栓 *泡沫 *自動撒水 *二氧化碳
*水霧 * CHEMICAL
4.空調設備
*風管 *空氣清淨處理
*水管 *消音防震
*冷凍冷藏 *恆溫恆濕
5. additional items to be listed ASAP
工程師.com,電機技師.Com, 電機技師.中國.cn
NYCritical.com,MCTIASia.com
DotOptical.com,DOPRAA.com
Action,AAA,WWW
File#: ieeemobiPPCPE11032009p1.1
Chatboard (1)